Simfield Access Solutions

Recent Works

Case Study – SYFR Drill Tower Periodic Inspections

Site – 8 No Sites Start Date – 11/04/2019 End Date – 11/08/2019 Client – J Roberts Design Ltd, South Yorkshire Fire and Rescue Introduction We were tasked with supply of access and periodic inspection of 8 No drill towers for South Yorkshire Fire and Rescue. Planning Working with SYFR and J Roberts a robust access

Read More »
Case Study – Merrion House Cladding

Case Study – Merrion House Brickworks

Site – Council Building, Leeds Start Date – March 2018 End Date – April 2018 Objective(s) – Carry out repointing works without impairing nearby pedestrian at street level or traffic. Introduction Our client at the Leeds Council Building was in desperate need of repointing. Unfortunately, being right beside a main road in a city centre

Read More »
Case Study – Victoria Station Inspections

Case Study – Victoria Station Coating Inspections

Site – Victoria Station, Manchester Start Date – August 2017 End Date – September 2017 Objective(s) – To inspect the steelwork for signs of corrosion and paint thickness. Introduction Maintenance issues become problematic when you can’t afford to shut down the site. The Victoria Station in Manchester brought Simfield in to help with their routine

Read More »
Case Study – Old Trafford Maintenance

Case Study – Old Trafford Maintenance

Site – Old Trafford Start Date – August 2017 End Date – September 2017 Objective(s) – Provide high level cleaning as part of the site’s mandatory yearly clean for maintenance purposes. Introduction Old Trafford required a yearly clean as part of their annual routine maintenance, and looked to find an effective solution while keeping costs

Read More »
Case Study – Merrion House Cladding

Case Study – Merrion House Cladding

Site – Merrion House, Leeds Start Date – April 2018 End Date – May 2018 Objective(s) – Repair and replace damaged cladding panels which were resulting in water seeping in. Introduction Merrion House is situated in the city centre of Leeds. After harsh weather, clad panels had become damaged which in turn led to water

Read More »

Case Study – Marwell Zoo ETFE Installation

Site – Marwell Zoo, Winchester Start Date – June 2017 End Date – August 2017 Objective(s) – To install safety netting at height allowing us to install an ETFE Introduction Our client at Marwell Zoo wanted a series of ETFE cushion skylights to create a new domed ceiling for the structure that allowed natural light

Read More »
Case Study - London Stadium

Case Study – London Stadium Maintenance / Clean

Site – London Stadium Start Date – November 2016 End Date – December 2016 Objective(s) – Conduct an inspection of previously installed ETFE material and carry out any external maintenance on the grounds. Introduction This was not the first time we have visited the London Stadium, home of West Ham UTD. Simfield previously visited to

Read More »
rope access london uk

Case Study – Liverpool Unity Building Bespoke Lifting Beam

Site – Liverpool Unity Building Start Date – June 2017 End Date – September 2017 Objective(s) – To provide a bespoke access solution to assist in the removal and replacement of damaged panes of glass. Introduction Our client at the Liverpool Unity Building faced a problem. Over time, weather had damaged some panes of glass

Read More »
Dalton Park Painting

Case Study – Dalton Park Painting and Coating Works

Site – Dalton Park, Murton Start Date – September 2017 End Date – January 2018 Objective(s) – To paint all the high access areas of the retail park’s metal work. Introduction Our original plan to access the high areas of the metal work structures beneath the tensile fabric canopy was to use a cherry picker

Read More »

London Olympic Stadium Transformation

Our client required us to provide the overall onsite management of the project, supervision, and guidance as well as specialist equipment and an effective team to provide the labouring services throughout the project.

Read More »